考研网 发表于 2018-11-3 14:15:31

2014考研英语:阅读理解实例解析(八)_跨考网

  面对一篇阅读理解,我们究竟应该如何下手?下面,我们通过具体的实例,来和小编分享一下考研英语阅读理解的剖析方法以及答题技巧。>>>考研英语复习备考手册
  Despitebulging order books, the mood at Airbus and Boeing is far from celebratory.Both aviation giants are moaning loudly that their production systems andsupply chains are flawed, albeit for ostensibly different reasons. This weekLouis Gallois, the boss of EADS, the Franco-German aerospace consortium thatowns Airbus, added substance to warnings a week earlier by the planemaker’s chief executive, Tom Enders,that the dollar’s decline was "life-threatening" for the firm. Mr Gallois saidit was no longer just a possibility that Airbus would have to move a large partof its production to "the dollar zone" or low-cost countries, but acertainty.
  Airbus isalready in the middle of Power8, a big restructuring plan that involves theloss of 10,000 jobs and the sale of several plants, which is meant to offsetthe losses caused by the delays in delivering the A380 superjumbo. But Power8assumed that a euro was worth $1.35, not today’s $1.47. Mr Gallois estimates thateach 10-cent rise in the euro costs Airbus €1 billion. At present, Airbusmakes 76% of its purchases within Europe, but generates over 60% of its saleselsewhere. It must now shift some production abroad.
  Airbus is nowlikely to forge ahead much further. Mr Gallois suggests that when the A350enters service in 2013, 70% of it will have been "purchased" indollars, against 50% for the A380 and an average 24% of Airbus productiontoday. Because Airbus insists that some of its European suppliers price indollars that means about 50% of the A350’s production will be outsourced.New aircraft, such as the A320’s successor, may be made almost entirely outside the euro-zone.
  Airbusmaintains that exchange rates are not the only reason for outsourcing: it iskeen to tap into composite-manufacturing expertise wherever it exists. It alsoinsists that it will not repeat the mistakes Boeing has made with its new 787Dreamliner, about 80% of which has been outsourced. A few weeks ago Mike Bair,the executive responsible for the 787 programme, who was recently movedsideways after mounting production delays, launched a withering attack on someof the companies recruited to build the plane. He said that in future Boeingwould not entrust design work to partners who "proved incapable of doingit", and would make suppliers build factories close to Boeing’s main assembly operation, ratherthan flying semi-finished sections of the aircraft round the world on hugeDreamlifter transporters.
  It is tooearly to conclude that the two rivals are heading in opposite directions-Boeingrenouncing the global supply chain just as Airbus adopts it. Each company hasits own axe to grind. Airbus needs greater flexibility, and the weak dollarprovides helpful cover as it takes on its grumbling unions. Boeing, for itspart, wants to shift the blame for delays to the 787 on to its partners. Thelogic of global outsourcing in the aerospace industry remains powerful.Whatever they may be saying now, Airbus and Boeing are more likely to convergethan to diverge.
  1. Airbuscarries out Power 8 because_____
   it cannotmake up the deficits caused by the dalays in delivering A380.
   it wantsto move its production abroad to handle the problem of dollar’s decline.
   it hasnot predicted the dollar decline at the beginning.
   it wantsto raise money to build new production sector in low-cost countries.
  2. The lessonAirbus learns from Boeing’s case of 787 Dreamliner is_____.
   it shouldnot adopt outsourcing at all given its uncertainty and insecurity.
   it shouldnot coopearte with partners in designing.
   it shouldnot waste time in flying the semi-finished sections of the aircraft.
   itshould make use of the local manufacturing expertise instead ofinternational partners.
  3. Accordingto the passage, the 787 programme is delayed probably because_____.
   theparteners are not incapable of building the plane.
   The suppliersare far away from the main assembly operation.
   80% of ithas been outsourced to other countries which affected efficiency.
   theexecutive is not qualified incapable of finding qualified partners.
  4. The word"converge" (Line 5, Paragraph 5) most probably means_____.
   unite
   combine
   meethttp://ks.examda.com
   coopearte
  5. Why Airbusand Boeing are more likely to converge than to diverge?
   Boeingquits the global supply chain while Airbus adopts it.
   Both ofthem need to adopt greater flexibility in the working process.
   Both ofthem need to make their foreign purchases and outsourcing more skillful andpowerful.
   Both ofthem have to take measures to deal with problmes caused by weak dollar.
  篇章剖析:
  这篇文章主要介绍了空中客车目前生产和采购方面的一些新的动向和调整,也提到了波音公司的一些调整。第一段讲述空中客车和波音两大飞机公司目前在生产、供应方面都面临一些新的问题,空中客车已决定要采取海外计划;第二段讲述空中客车目前的一些问题;第三段讲述空中客车将来在采购方面的计划;第四段讲述空中客车海外计划的另外一个原因;第五段讲述空中客车和波音公司虽然表面看起来采取的措施不同,但其海外采购的大方向是确定的。
  词汇注释:
  albeit conj. 虽然
  ostensiblyadv. 表面上
  consortium n.社团,协会
  outsource v. 外部买办,采购
  superjumbo n.巨型喷气式飞机
  forge aheadv. 向前迈进
  tap into v. 接入
  grumblingadj. 嘟嘟囔囔的, 抱怨的; 疼痛的
  converge v. 会聚,会合
  renounce v. 放弃
  拓展提高:公共课复习全程指导
                        
                   转眼间霜降已过,一阵阵北风让树叶纷纷凋落,2019的考生即将迎来考验的大时刻,这个阶段更要稳住步伐不慌不乱,跨小考期待与你考后在跨考教育导师库相见,那时再为已经通过初试,准备复试的你助力!
       据相关调查统计显示,以就业为导向,想要提高自身就业筹码而选择考研的考生占整体的近70%,准备开启2020考研征程的你,是为了什么而一往无前呢?为了给自己一个选择的机会,也为了更了解将来就业企业的择人标准,你需要趁这个寒假为考研开启预热模式——跨考寒假预科班,15天集训,直接定校定专业,让你全年的复习不再左摇右摆浪费时间!
      
       小编整理了历年考研真题及答案解析,关注微信公众号:跨考考研,回复“真题”即可获得,说不定还能找到一起上自习的研友哦!

       
        2019秋季整合提升方案
       
       
        2019考研公共课秋季整合
        2019最新考研政治大纲
        公共课考研大纲变动汇总
       
       
        2019年考研政治《思修法基》练习试题及答案汇总
        【跨考名师精品】2019考研必读:复习方法及真题热点解读
       
       
        抓住最后选择院校专业的机会
        2019考研:就业率高的十大考研专业推荐
        34所自主划线高校历年复试分数线(2012-2018)
       
       
        2019考研:这些相似的考研专业都有什么区别?
        跨专业考研难度较大的六大专业
       

页: [1]
查看完整版本: 2014考研英语:阅读理解实例解析(八)_跨考网